Leave Your Message
The Role of Well Completions in the Oil and Gas Industry
Knowledge

The Role of Well Completions in the Oil and Gas Industry

2024-11-06

Well Completions is an integral and significant part of the Oil and Gas Industry. It dictates the techniques and usage of various down-hole tools that play an important role in ensuring that the reservoir fluids reach the surface. Also ensuring that the producing zones are isolated from the Non-Producing Zones. The primary functionality begins with preparing the area around the pay-zone and servicing it. In the due course of drilling operations, the formation deals with high amounts of invasive and heavy fluids such as drilling mud or cement, which is used to secure the well from collapsing on itself and negating the flow of hydrocarbons from other zones. Maintaining a negative or a zero skin factor is imminent in ensuring that the well has good productivity, as it enables the free flow of the hydrocarbons into the tubing. To maintain this, regular servicing of the well such as hydraulic fracturing, acidization, well stimulation, etc., can be put to effective usage. One can state that well completions ensure the fact that the well is ready for production or injection as per the well placement and well depth.

Types of well completions: 

Basing on the different type of Reservoirs, there are different types of well completion methods. Most commonly used methods are:

● Open hole Completions: This method of completion was predominantly used in the yesteryears when drilling was carried on with cable tools. This method does not provide control over fluid flow and does not provide any zonal isolation, but at the same time is very cost-effective. As the well is activated and begins to flow, it is quite difficult to employ injection or artificial lift methods. Refer Fig.1

● Liner completions: In a regular case, the production tubing is run from the wellbore to the wellhead, but in this scenario, if the well has high reservoir pressure and the production casing is less than 7” ID, then the liner can be hung from the previous casing into the wellbore using a liner hanger. The liner comes in various configurations, namely: slotted, screen, and cemented liner. Basing on the requirements and the presence of the solids in the formation, the liner is finalized.

● Perforated Casing completions: In this method, the tubing is run from the wellbore to the wellhead and is cemented as well. Once the primary cementation is completed, the well is perforated in order to have access to the formation with no damage from the well fluids. This will enable the flow of reservoir fluids into the tubing. This method is very widely used in modern days as it provides good zonal isolation and allows the user to selectively produce from various zones or produce from all zones at the same time or use some zones for injection and some for the production of fluids.

Importance of Tubing Design and Tool Placement

Tubing design and tool placement should be given precedence to ensure good health of the reservoir. Tubing design is essential in maintaining the reservoir pressure, which can facilitate primary recovery for a prolonged time. Understanding IPR, TPR curves, and their correlations should be considered before selecting the size of tubing. Improper tubing design will lead to diminished flow of the reservoir fluids to the surface, which can lead to negative ROI for the operators. After the mode of completion is selected, then the decision is taken if the producing zone will be singular or multiple. If it is, a single zone production then the completion costs and complications will be greatly reduced and is mostly straightforward if all the assumptions utilized in the string design are true. The next option is that the well will produce from multiple zones. This requires intricate planning of various downhole tools and equipment. Proper tool placement provides good control over the reservoir, hydraulic isolation, and flow rates. The completion string comprises two parts namely upper and lower completion. Lower completions mainly comprise down-hole tools that will be discussed in future articles. 

Packers are an integral and most important component in the completion string. There are various types of packer, on basis of setting mechanism, packers are differentiated as Hydraulic and Mechanical set, on basis of retrieving they are bifurcated as Permeant set and retrievable packers and on basis of gripping mechanism they are divided as single grip and double-grip. Basing on the orientation of the Well-Bore, Pressure and temperature at the desired location, Depth of the target zone the packer/s is selectively placed in the completion string.  

Packers in Well Completions

Packers are an integral and most important component in the completion string. There are various types of packers, on basis of the setting mechanism, packers are differentiated as hydraulic and mechanical set, and Wireline set. On basis of retrieving, they are bifurcated as permanent set and retrievable packers and on basis of gripping mechanism they are divided as single grip and double-grip. Basing on the orientation of the wellbore, pressure and temperature at the desired location, and depth of the target zone the packer/s is selectively placed in the completion string.

Packers play an indispensable role in the oil and gas industry, significantly impacting the extraction process. As a committed participant in this sector, Vigor understands that an excellent packer can save clients substantial time and labor costs. Therefore, we continuously research and develop various packer models to ensure our customers benefit from the world's leading products. If you are interested in Vigor’s packers, please do not hesitate to contact us for professional products and exceptional service. Choose Vigor for unparalleled reliability and support in your oil and gas projects. For more information, you can write to our mailbox info@vigorpetroleum.com & marketing@vigordrilling.com

img (1).png